Cape Cod Windfarm Met Mast

Cape Cod Windfarm Met Mast Specially Designed SSCS Frond Mats were installed in 2005, as shown in the Deployment Plan, at the South East Pile of the Cape Cod Met Mast Tripod Support Structure in approx: 5.5mwd.

Cape Cod Wind Farm Site is located in Horseshoe Shoal 25km from the town of Nantucket off the east coast...

Read more>

Broadlands

Broadlands The UK East Anglia Broadlands river banks and beds have, and continue to be, eroded by fast flowing tidal currents and the wash created by motorised leisure craft.

The Broadlands Flood Alleviation Project Team who also...

Read more>

Bass River

Bass River SSCS Frond Scour Control Mats were installed to re-establish and re-instate the river bed where it had been excavated following its pollution.

The project entailed the dredging of coal tar contaminated sediments from within the river, followed by installation of a sediment...

Read more>

Arklow Windfarm T5

Arklow Windfarm T5 Arklow Bank is a shallow water sandbank located 10 km off the east coast of Ireland in approx: 3mwd. It is exposed to strong currents, frequently exceeding 2m/s, breaking waves and has a dynamic sand/gravel seabed.

Specially Designed SSCS Frond Mats were installed in 2008 around the 6.3 metre diameter T5 Turbine Pile Foundation and along...

Read more>

Arklow Windfarm Met Mast

Arklow Windfarm Met Mast Arklow Bank is a shallow water sandbank located 10 km off the east coast of Ireland in approx: 3mwd. It is exposed to strong currents, frequently exceeding 2m/s, breaking waves and has a dynamic...